Standardized work
What is Devon expected to do, and what is missing from that sheet?
Devon Cho, cell lead, cell 2, seat-face machining. Posted elements only. The 12-minute walk for a blank rev is not on this sheet.
Load5
Rough cut16
Finish cut11
Deburr6
In-cell check4
Mark the rev4
Posted total46
How this sheet sits with the others
The posted sequence is load 5, rough cut 16, finish cut 11, deburr 6, in-cell check 4, and mark the rev 4. The rule is: do not run if the traveler rev differs from Rev C. The 12-minute walk for a blank rev is not on the sheet. The sheet says what was expected. It does not say what cell 2 did today.
- What it makes visible
- The posted sequence, the Rev C rule, and the walk that is not on the sheet.
- When it is useful
- When the observed day does not match the posted method.
- Who uses it
- Devon Cho runs it. Mara Ellison holds the release rule in front of it.
- What it takes
- The six elements and times, drawing Rev C, and the rule not to run a mismatched traveler.
- What it leaves
- A posted method of 46 minutes, a stop rule when the traveler is not Rev C, and a 12-minute walk the sheet does not list.
- The underlying record
- The six elements posted for Devon Cho, the rule that the traveler match Rev C, and the walk that sheet does not contain are what the balance chart, the control plan, and the cell walks are about.
Where these facts go next
What this sheet still leaves out
It has no evidence of what happened today.